Modi Jalvidyut Company Limited
Upper Modi Hydroelectric Project — 18.2 MW

Project Overview
The Upper Modi Hydroelectric Project (UMHEP) is an 18.2 MW run-of-river hydropower project located in Annapurna Rural Municipality, Kaski District, Gandaki Province. It forms the lower stage of the Modi Cascade Project being developed by Modi Jalvidyut Company Limited.
The project utilizes the tailrace discharge from the Upper Modi ‘A’ Hydroelectric Project, conveyed through an approximately 700 m interconnection structure to the head pond. From there, water is conveyed through a 4,244 m headrace tunnel to the powerhouse. With a gross head of 135.0 m and rated discharge of 16.15 m³/s, the project is designed to generate an estimated 109.217 GWh of electricity annually through two vertical-axis Francis generating units.
Key Project Features
Interconnection & Water Conveyance
- Interconnection Structure
- 700 m long RCC box culvert; 3.2 m wide × 3.2 m high
- Head Pond
- 32 m long × 10 m wide × 6.9 m high
- Headrace Tunnel
- 4,244 m long; modified horseshoe section with 3.5 m internal diameter
- Adit Tunnel
- 190 m long
Surge & Powerhouse System
- Surge Tank
- Restricted-orifice type; 10 m diameter × 38.6 m high
- Powerhouse
- Surface/semi-surface; 33 m long × 15.5 m wide × 24 m high
- Generating Units
- 2 × 9.113 MW vertical-axis Francis turbines
Power Evacuation
- Transmission Voltage
- 132 kV
- Transmission Arrangement
- 11.5 km single-circuit transmission line to New Modi Substation
Contract & Implementation
- Developer / Employer
- Modi Jalvidyut Company Limited
- Contract Package
- Lot 1 — Civil and Hydromechanical Works
- Contract Model
- Engineering, Procurement and Construction (EPC)
- EPC Contractor
- WAIBA–RSC JV
- Design Review & Construction Supervision
- NEA Engineering Company Limited
Related Photography